This page reports information on the capacity of existing, withdrawn, committed, and proposed generation projects in the National Electricity Market (NEM). AEMO collects generation information reported here from generation industry participants, via a web-based online system, and i...
-
Latest Updates
-
Filters
-
-
-
-
Updated 11 Apr 2018
-
-
-
-
-
Updated 26 Mar 2018
-
-
-
-
-
Updated 23 Mar 2018
-
Advice to the Commonwealth relating to AGL’s proposal to replace Liddell
This analysis is provided in response to the Federal Energy Minster's request for the Australian Energy Market Operator (AEMO) to assess AGL’s plan to replace the energy and capacity currently delivered by the Liddell Power Station (Liddell) following its retirement in 2022.
-
-
-
-
-
Updated 20 Mar 2018
-
AEMO observations: operational and market challenges to reliability and security in the NEM
AEMO has published an analysis of the reliability and security challenges confronting us in the NEM and some steps forward for addressing them.
-
-
-
-
-
Updated 19 Mar 2018
-
AEMO publishes Quarter Energy Dynamics – Q4 2017
AEMO has published a “Quarterly Energy Dynamics” report to provide energy market participants businesses, consumers, governments and other interested parties with information on the market dynamics, trends and outcomes during Q4 2017 (1 October to 31 December 2017).
-
-
-
-
-
Updated 06 Mar 2018
-
AEMO publishes Power system requirements paper
AEMO has published a “Power system requirements” paper to help readers understand the technical and operational needs of the power system, based on the laws of physics that remain constant even as modern power systems like the NEM transform – and explained on EnergyLive some of the key technical concepts in everyday language.
-
-
-
-
-
Updated 06 Feb 2018
-
-
-
-
-
Updated 04 Jan 2018
-
Update to NEM load table (Unmetered Loads) – current proposals
Proposal to Update NEM Load Table (Unmetered Loads) Following the migration from the Jurisdictional Metrology Procedures to the NEM Metrology Procedure, the obligation to update and publish the Load Tables for Type 7 Metering Installations (NEM Load Table) lies with AEMO. The NEM L...
-
-
-