-
-
Demand Side Participation Information Guidelines
-
In this section
-
In this section
- Interactive maps and dashboards
- Electricity Forecasting Insights
- Previous National Electricity Forecasting Report
- NEM Electricity Statement of Opportunities
- Integrated System Plan
- National Transmission Network Development Plan
- Victorian transmission network service provider role
- Independent regional planning reports
- Load forecasting in pre-dispatch and STPASA
- Solar and wind energy forecasting
- Transmission Connection Point Forecasting
- Generation information page
- South Australian Advisory Functions
- Energy Adequacy Assessment Projection (EAAP)
- Value of Customer Reliability
- Demand Side Participation Information Guidelines
- Power System Frequency Risk Review
-
-
AEMO is developing a data portal for participants to submit their Demand Side Participation (DSP) information in accordance with the Demand Side Participation Information Guidelines (Guidelines).
Participants will require secure access to the data portal to submit data, and will require a user account for authentication. These user accounts can be created within each business by the Participant Administrator.
Further technical and background information about DSP information can be found below.
Update: 07 March 2018
AEMO has published a guide for the Demand Side Participation Information Portal (1.7 MB, pdf).
Participants can now configure user access for the new portal within the production environment. However, please note that the portal itself will not be available until the window opens for participant submissions.
Contact: energy.forecasting@aemo.com.au
DSP Portal next steps:
The next steps are:
18 December 2017
Pre-Prod system available for participants to familiarise themselves and to test their processes and systems. This system will be available until at least 31 January 2018.
Complete 31 January 2018 Participants involved in the pre-prod system testing to provide their feedback to AEMO.
Please send feedback to: energy.forecasting@aemo.com.auComplete ** February 2018
AEMO intends to hold a meeting to facilitate participant feedback regarding the data portal.
Invites will be sent to the nominated contact persons for their participation in a meeting.
Complete March 2018 AEMO intends to hold a meeting for interested stakeholders to walk through the new data portal. Please contact Forecasting if you are interested in attending. Complete 31 March 2018
The data portal will go live for participant submissions to begin.
COB 30 April 2018
DSP information submissions close.
** Participants may still provide their feedback after 31 January 2018, and improvements will be considered on a case-by-case basis.
Further technical Information:
The DSP data portal will leverage existing AEMO infrastructure and will use MarketNet - AEMO’s private data network connection. For further details about the options available to connect to MarketNet, refer to AEMO’s Guide to Information Systems.
AEMO has produced a guide for the Demand Side Participation Information Portal (1.7 MB, pdf). This is also available online within the AEMO Markets Portal.
For participants wanting to use the CSV file submission method, CSV template files and guide are provided below:
Background:
As required by clause 3.7D of the National Electricity Rules (NER), AEMO consulted on the development of Demand Side Participation Information Guidelines (Guidelines) in accordance with the Rules consultation process in rule 8.9.
The Guidelines specify the information that Registered Participants must submit to AEMO for AEMO’s use when developing or using electricity load forecasts, with the objective of giving AEMO better quality information to further develop and improve its current load forecasting.
These Guidelines are effective as of 19 July 2017. Each year, beginning March 2018, Registered Participants must provide data that was current as at 31 March of that year, by 5.00pm 30 April.
Contact: energy.forecasting@aemo.com.au